As per Aadhar Regulations 2016, User Agencies/ Proponents are advised, not to upload any personal/ confidential documents (like Aadhar Card, PAN Card, Voter ID etc) at the time of filling the online application

List of Proposals accorded Stage-II Clearance (Proposals received on or after 15th July 2014)








Note :-All areas are in Hectares(ha.)
Sno.State NameProposal No.RO/Ministry File NumberProposal NameCategoryUser Agency NameArea (ha.)Proposal StatusImportant DatesAllocation of Fresh forest land (Form-A) Part-IView Report (Part-II to Part-V and Stage-I Clearances)Stage-II Approval on
1 Andhra Pradesh FP/AP/IND/10371/2015 4-APB010/2015-CHN Proposal for Diversion of 0.49Ha forest land in Odalarevu Protected forest Industry ONGC 0.49 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Feb 2015
Stage-I Approval on : 21 Aug 2015
Compliance Report Submitted by User Agency on : 29 Sep 2016
09 Jan 2017
2 Andhra Pradesh FP/AP/MIN/30265/2017 4-APB062/2018-CHN This is new mining lease applied for Barytes by Smt.J.C.Vijaya, Tadipatri. The applied area situated in a backward drought prone district of Ananthapuramu of Andhra Pradesh State. The applied area is in Sy. No. 1/P of Ellutla (V), Putlur (M), Ananthapuramu (D), Andhra Pradesh State over an extent o Mining JC VIJAYA ELLUTLA BARYTES MINE 1.95 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2018
Stage-I Approval on : 21 Aug 2018
Compliance Report Submitted by User Agency on : 12 Oct 2018
02 Nov 2018
3 Andhra Pradesh FP/AP/Others/14866/2015 4-APB008/2015-CHN Diversion of 0.30 Ha of Forest Land in Compt. No. 85 of Pasuvemula RF of WLM -Markapur Division for Laying of Optical Fibre Cable in favour of Idea Cellular Ltd. Others IDEA CELLULAR LIMITED 0.3 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Aug 2015
Stage-I Approval on : 08 Jan 2016
Compliance Report Submitted by User Agency on : 04 Jul 2016
14 Jun 2016
4 Andhra Pradesh FP/AP/IRRIG/16627/2015 4-APB019-2016-CHN Proposal for the Project of Excavation of Tunnel passing through Damarasingi reserve forest hill range. Irrigation WATER RESOURCES DEPARTMENT 4.42 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Nov 2015
Stage-I Approval on : 01 Nov 2016
Compliance Report Submitted by User Agency on : 19 Jul 2018
10 Jul 2018
5 Andhra Pradesh FP/AP/MIN/10909/2015 4-APB047/2017-CHN Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler Mining SAI JOSHITHA GRANITES 4.83 Pending at DFO for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 19 Mar 2015
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 13 Nov 2018
6 Andhra Pradesh FP/AP/TRANS/22375/2016 GO.Rt.No.87, Dt:17.04.2017 Proposal for Erection of 33kv Transmission line from wind farm common point VCB yard at pattanagaram to 132/33kv substation of AP Transco grid at Banaganapaali, Kurnool District, A P. Transmission Line APSPDCL DHONE 0.85 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Nov 2016
Stage-I Approval on : 17 Apr 2017
Compliance Report Submitted by User Agency on : 28 Jun 2017
01 Aug 2017
7 Andhra Pradesh FP/AP/ROAD/10475/2015 3343/ Section-II/2016 Rehabilitation and upgradation of NH-221 (New NH-30) from Km 32.735 to 71.200 (Chandragudem - AP/Telangana Border Section), Krishna District in the State of Andhra Pradesh, National Highway Development Programme. Road HIGHWAYS 0.52 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Apr 2016
Stage-I Approval on : 25 Jul 2016
Compliance Report Submitted by User Agency on : 24 Sep 2016
16 Feb 2017
8 Andhra Pradesh FP/AP/Others/26189/2017 4-APB037/2017-CHN Proposal for diversion of Forest land an extent of 0.99 Ha. in the Tadepalli RF, Mangalagiri Block of S.No.372 of Tadepalli Village, for Construction of 132/33KV Sub- Station AIIMS at Mangalagiri in Guntur Division and District for extending Supply to the AIIMS. Others EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR 0.99 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 May 2017
Stage-I Approval on : 20 Jun 2017
Compliance Report Submitted by User Agency on : 26 Jun 2018
25 Jun 2018
9 Andhra Pradesh FP/AP/ROAD/19123/2016 4-APB017/2016-CHN Diversion of 2.26 Ha of Forest land in Sangam RF of Atmakur Range in Nellore Division for Upgradation of NH-67 from Km.707+500 to Km.708+880 to two lane with paved shoudlers in the State of AP under NHDP-IV through EPC basis. Road MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA 2.26 APPROVED
Proposal received(at Nodal Officer)electronically on : 06 May 2016
Stage-I Approval on : 20 Sep 2016
Compliance Report Submitted by User Agency on : 17 Jul 2017
04 Aug 2017
10 Andhra Pradesh FP/AP/QRY/26282/2017 4-APC051/2017-CHN Proposal for Diversion of 9.16 Ha(Mininig-7.62, Sz-1.40, Road-0.14)of Forestland in Compt.No.200, Bodabandla RF & Beat of Chittoor West Division, Chittoor District in favour of S.S.Granites, Prop: P. Suryanarayana Reddy. Quarrying P SURYANARAYANA REDDY 9.16 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 06 Jun 2017
Stage-I Approval on : 27 Mar 2018
Compliance Report Submitted by User Agency on : 16 Jul 2018
11 Bihar FP/BR/Others/25453/2017 FP/BR/Others/25453/2017 Diversion of 0.0045 ha of forest land for construction of approach road for opening retail outlet of BPCL on Vidhapati-Dalsinghsarai Road in Samastipur district of Bihar. Others RAKESH KUMAR PASWAN 0.0045 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Mar 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 30 Aug 2017
06 Dec 2017
12 Bihar FP/BR/Others/23849/2017 FP/BR/OTHERS/23849/2017 the applicant on the PWD, Aandar-Raghunathpur Road, District-Siwan on Khata No.- 79, Plot No.- 424, Village – Haibatpur, Takuka - Raghunathpur, State- Bihar. The road side land 0.012 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will suppl Others ASHOK KUMAR GUPTA 0.012 APPROVED
Proposal received(at Nodal Officer)electronically on : 31 Jan 2017
Stage-I Approval on : 23 Aug 2018
Compliance Report Submitted by User Agency on : 10 Oct 2018
08 Nov 2018
13 Bihar FP/BR/Others/18744/2016 FP/BR/Others/18744/2016 the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others SHILPA 0.0244 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Mar 2016
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 08 Dec 2017
09 Jan 2018
14 Bihar FP/BR/ROAD/26896/2017 FP/BR/ROAD/26896/2017 Widening and Strengthening of Biraul-Singhia via Pipra Road Road EXECUTIVE ENGINEER ROAD DIVISION BENIPUR 4.8856 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jun 2017
Stage-I Approval on : 01 Mar 2018
Compliance Report Submitted by User Agency on : 01 Jun 2018
30 May 2018
15 Bihar FP/BR/Others/23809/2017 FP/BR/Others/23809/2017 ESTABLISHMENT OF RETAIL OUTLET OF HINDUSTAN PETROLEUM CORPORATION LIMITED Others HINDUSTAN PETROLEUM CORPORATION LTD 0.0387 APPROVED
Proposal received(at Nodal Officer)electronically on : 30 Jan 2017
Stage-I Approval on : 16 Jul 2018
Compliance Report Submitted by User Agency on : 25 Oct 2018
14 Nov 2018
16 Bihar FP/BR/Others/18228/2016 FP/BR/Others/18228/2016 M/s ultra Tech Cement Ltd. is Proposing for setting up of 2.0 million Tonnes per annum cement Grinding Unit at Villages. Others ULTRATECH CEMENT PVT LTD 0.77 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Feb 2016
Stage-I Approval on : 30 Dec 2016
Compliance Report Submitted by User Agency on : 21 Aug 2017
19 Sep 2017
17 Bihar FP/BR/ROAD/25893/2017 FP/BR/ROAD/25893/2017 NH 327 E Galgalia-Thakurganj-Bahadurganj Section Under Kishanganj District Road NH DIVISION ARARIA 15.6 APPROVED
Proposal received(at Nodal Officer)electronically on : 29 Apr 2017
Stage-I Approval on : 19 Jul 2018
Compliance Report Submitted by User Agency on : 13 Oct 2018
23 Oct 2018
18 Bihar FP/BR/Others/25319/2017 FP/BR/Others/25319/2017 Diversion of 0.00615 ha of forest land for construction of approach road for opening retail outlet of HPCL on Bhagipatty-Samaur Road in Gopalganj district of Bihar. Others PRAMATMA KUMAR SINGH 0.00615 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Mar 2017
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 16 Oct 2017
03 Jan 2018
19 Bihar FP/BR/TRANS/27209/2017 FP/BR/TRANS/27209/2210 The scheme is for construction of 400 KV D/C Nabinagar-II Patna Transmission Line. The proposed Transmission Line will connect the 1980 MW capacity Nabinagar stage-II Thermal Power Project (under construction) with 400/220 KV, Patna Substation of POWERGRID, Bihar. The line traverses though Aurangaba Transmission Line POWERGRID CORPORATION OF INDIA LIMITED PATNA 1.8446 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jul 2017
Stage-I Approval on : 18 May 2018
Compliance Report Submitted by User Agency on : 25 Oct 2018
08 Nov 2018
20 Bihar FP/BR/Others/27400/2017 FP/BR/OTHERS/27400/2017 The proposal for establishment of retail outlet dealership of M/s Indian Oil corporation Ltd. Form purbi Nala (khar) within 01 Km From Misir Bandhora Bhore Pagra PWD Road at Mauza- Misir Bandhaura Khata No. 26 Plot No. 747 Vill+P.O. Vijaypur, Dist- Gopalganj. State Bihar. The road Side land 0.01275 Others AMRENDRA IOCL 0.01275 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Jul 2017
Stage-I Approval on : 14 Jun 2018
Compliance Report Submitted by User Agency on : 05 Jul 2018
08 Aug 2018
21 Bihar FP/BR/ROAD/17264/2015 FP/BR/ROAD/17264/2015 The forest land is required for diversion of Forest land for Cunstruction of road from 2nd K.M (Ekmi Ghat) of Darbhanga Samastipur Road (SH-50) to Shobhan Village (NH-57) over the western embankment of Khiroi River from 0 to 9.641 Km in Mithila Forest Division (Darbhanga District) in Bihar State. Road EXECUTIVE ENGINEER ROAD CONSTRUCTION DEPATMENT 11.569 APPROVED
Proposal received(at Nodal Officer)electronically on : 28 Dec 2015
Stage-I Approval on : 19 May 2016
Compliance Report Submitted by User Agency on : 06 Dec 2017
04 Oct 2017
22 Bihar FP/BR/Others/25243/2017 FP/Br/Others/25243/2017 Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of Essar Oil Ltd. on Muzaffarpur-Sonbarsa Road (NH-77) in Sitamarhi district of Bihar. Others ANAND RAY 0.018 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Mar 2017
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 15 Jan 2018
13 Mar 2018
23 Bihar FP/BR/TRANS/28910/2017 FP/BR/TRANS/28910/2017 Strengthning of transmisson system in bihar Phase-IV Part-1 Transmission Line BSPTCL JAMUI 0.14 APPROVED
Proposal received(at Nodal Officer)electronically on : 27 Aug 2017
Stage-I Approval on : 30 May 2018
Compliance Report Submitted by User Agency on : 08 Oct 2018
05 Oct 2018
24 Bihar FP/BR/ROAD/22061/2016 FP/BR/ROAD/22061/2016 Widening and Strengthen in KM Katauna (62.00)- Gidhaur (75.00) KM of NH-333 in the State of Bihar Road EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER 12.4326 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Oct 2016
Stage-I Approval on : 06 Dec 2017
Compliance Report Submitted by User Agency on : 22 Mar 2018
18 May 2018
25 Bihar FP/BR/Others/32784/2018 FP/BR/OTHERS/32784/2018 The proposal for establishment of retail out-let (Petrol Pump) dealership of M/S IOCL Located within 6-10 KM from SH-22 Sultanganj-Deoghar Road District Munger Bihar Others SHAKSHI MOHAN SINGH 0.02424 APPROVED
Proposal received(at Nodal Officer)electronically on : 26 Mar 2018
Stage-I Approval on : 30 May 2018
Compliance Report Submitted by User Agency on : 05 Jul 2018
07 Aug 2018
26 Bihar FP/BR/ROAD/26383/2017 FP/BR/ROAD/26383/2017 Construction of Two Lane with paved Shoulder of Bhagalpur BYPASS From KM 124.175-KM 140.850 Length 16.675 KM of NH-80 Road EXECUTIVE ENGINEER NH DIVISION BHAGALPUR 0.38 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 May 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 22 Mar 2018
06 Apr 2018
27 Bihar FP/BR/Others/27395/2017 FP/BR/Others/27395/2017 Diversion of 0.0.015 ha of forest land for construction of approach road for opening retail outlet of HPCL on on side NH-83, Gaya-Jahanabad Road in Gaya district of Bihar. Others AMRESH KUMAR 0.015 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Jul 2017
Stage-I Approval on : 21 Nov 2017
Compliance Report Submitted by User Agency on : 12 Mar 2018
26 Mar 2018
28 Bihar FP/BR/WATER/33325/2018 FP/BR/WATER/33325/2018 Rajgir Nager Panchyat facing acute water shortage every year in order to meet the public requirement the PHED Biharsharife has entrusted to ensure water supply from Falgu River in Nawada district through under ground pipeline the pipeline has to be passed along NH-82 to supply safe drinking water. Drinking Water EXECUTIVE ENGINEER P H DIVISION BIHARSHARIF 0.360636 Pending With-SG for verifying Compliance of Conditions
Proposal received(at Nodal Officer)electronically on : 25 Apr 2018
Stage-I Approval on : 16 Jul 2018
Compliance Report Submitted by User Agency on : 15 Dec 2018
29 Bihar FP/BR/Others/25843/2017 FP/BR/Others/25843/2017 Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-7 in Gaya district of Bihar. Others PRADEEP YADAV IOCL 0.015 APPROVED
Proposal received(at Nodal Officer)electronically on : 25 Apr 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 22 Sep 2017
24 Nov 2017
30 Bihar FP/BR/Others/25228/2017 FP/BR/Others/25228/2017 Diversion of 0.00375 ha of forest land for construction of approach road for opening retail outlet of HPCL on Lalganj Road (SH-74) in Vaishali district of Bihar. Others SATRUDHAN KUMAR 0.00375 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Mar 2017
Stage-I Approval on : 01 Jun 2017
Compliance Report Submitted by User Agency on : 14 Sep 2017
24 Nov 2017
31 Bihar FP/BR/TRANS/30978/2017 FP/BR/TRANS/30978/2017 Strengthening of transmission system in Bihar under Phase-IV Part-1 Transmission Line BSPTCL SIWAN 0.2673 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Dec 2017
Stage-I Approval on : 30 May 2018
Compliance Report Submitted by User Agency on : 08 Oct 2018
05 Oct 2018
32 Bihar FP/BR/Others/28885/2017 FP/BR/Others/28885/2017 Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of IOCL on on side Chapra-Marhowrah Raod in Saran district of Bihar. Others BAIJANTI KUMARI 0.018 APPROVED
Proposal received(at Nodal Officer)electronically on : 24 Aug 2017
Stage-I Approval on : 03 Apr 2018
Compliance Report Submitted by User Agency on : 26 Nov 2018
14 Nov 2018
33 Bihar FP/BR/Others/29855/2017 FP/BR/ROAD/29855/2017 Diversion of 0.03225 ha of forest land for construction of approach road for opening retail outlet of IOCL on Gaya-Dobhi Road (NH-83) in Gaya district of Bihar. Others ALOK AMITHABH 0.03225 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Oct 2017
Stage-I Approval on : 18 May 2018
Compliance Report Submitted by User Agency on : 11 Oct 2018
28 Nov 2018
34 Bihar FP/BR/Others/25174/2017 FP/BR/Others/25174/2017 Diversion of 0.00825 ha of forest land for construction of approach road for opening retail outlet of BPCL on Rosra-Samastipur-Dalsinghsarai Road (PWD Road) in Samastipur district of Bihar. Others ABHA SUREKA 0.00825 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Mar 2017
Stage-I Approval on : 11 Aug 2017
Compliance Report Submitted by User Agency on : 08 Jun 2018
28 Jun 2018
35 Bihar FP/BR/Others/20132/2016 FP/BR/Others/20132/2016 The road side land 0.0150 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others PRAMOD KUMAR SONI 0.015 APPROVED
Proposal received(at Nodal Officer)electronically on : 23 Jun 2016
Stage-I Approval on : 26 Sep 2017
Compliance Report Submitted by User Agency on : 07 May 2018
30 May 2018
36 Bihar FP/BR/TRANS/22212/2016 FP/BR/TRANS/22212/2016 Tower Package -P224- TW02 for construction of 400 KV D/C Transmission Line and LILO at Farraka- & Gokerna associated with ERSS-V. The line is passing through district of South 24 Pargana, North 24 Pargana, Nadia, Burdhaman, Murshidabad, Birbhum,in West Bengal, Pakur, Godda, & Sahibganj in Jharkhand, Transmission Line POWERGRID PURNEA 0.768 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Nov 2016
Stage-I Approval on : 06 Jul 2017
Compliance Report Submitted by User Agency on : 25 Oct 2018
14 Nov 2018
37 Bihar FP/BR/TRANS/26312/2017 FP/BR/TRANS/26312/2017 Construction of 33 KV Line from Katoria (Banka) to Simurtala 33 KV line from Katoria to Simurtala for evacuation of power from Katoria Substation Transmission Line ELECTRICAL EXECUTIVE ENGINEER (PROJECT), JAMUI 9.846 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 May 2017
Stage-I Approval on : 01 Jun 2018
Compliance Report Submitted by User Agency on : 25 Oct 2018
06 Nov 2018
38 Bihar FP/BR/ROAD/25145/2017 FP/BR/ROAD/25145/2017 Widening to 2 lane with paved shoulder from KM 0.00-40.00 of NH-2C Dehri-Banjari-Akbarpur Road Road EXECUTIVE ENGINEER N. H. DIVISION GAYA 17.06 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Mar 2017
Stage-I Approval on : 01 Feb 2018
Compliance Report Submitted by User Agency on : 22 Mar 2018
04 Apr 2018
39 Bihar FP/BR/Others/18064/2016 FP/BR/Others/18064/2016 the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pumpsets. etc. Others SUPERNA SAH 0.0165 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Feb 2016
Stage-I Approval on : 20 Jun 2016
Compliance Report Submitted by User Agency on : 15 Feb 2018
09 Apr 2018
40 Bihar FP/BR/Others/30959/2017 FP/BR/OTHERS/30959/2017 Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57, Simrahi Bazar-Bhaptiyahi Road in Supaul district of Bihar. Others RAMESH PRASAD YADAV 0.0285 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Dec 2017
Stage-I Approval on : 08 Aug 2018
Compliance Report Submitted by User Agency on : 26 Sep 2018
08 Nov 2018
41 Bihar FP/BR/Others/23218/2016 FP/BR/Others/23218/2016 The road side land 0.0375 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others ABHISHEK KUMAR G 0.0375 APPROVED
Proposal received(at Nodal Officer)electronically on : 22 Dec 2016
Stage-I Approval on : 12 May 2017
Compliance Report Submitted by User Agency on : 31 Jul 2017
15 Sep 2017
42 Bihar FP/BR/Others/20581/2016 FP/BR/Others/20581/2016 The road side land 0.0416 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc. Others RABINDRA KUMAR SHAHI 0.0416 APPROVED
Proposal received(at Nodal Officer)electronically on : 21 Jul 2016
Stage-I Approval on : 25 Aug 2017
Compliance Report Submitted by User Agency on : 13 Sep 2017
16 Oct 2017
43 Bihar FP/BR/Others/28797/2017 FP/BR/Others/28797/2017 The proposal for establishment of retail out-let IOCL dealership of M/s IOCL NH-49 within 2 KM from kushar chowk (Hajipur to Tajpur Road) Others NAVEEN CHANDRA BHARTI 0.1225 APPROVED
Proposal received(at Nodal Officer)electronically on : 20 Aug 2017
Stage-I Approval on : 13 Mar 2018
Compliance Report Submitted by User Agency on : 09 Apr 2018
02 May 2018
44 Bihar FP/BR/Others/26239/2017 FP/BR/Others/26239/2017 Patna-Motihari-Baitalpur Pipeline and its extension upto Raxaul. This proposal is for Motihari to Raxaul section. Proposed pipeline is going through Motihari Forest Division Others INDIAN OIL CORPORATION LIMITED PIPELINES DIVISION 0.6536826 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 May 2017
Stage-I Approval on : 26 Feb 2018
Compliance Report Submitted by User Agency on : 18 Jul 2018
28 Aug 2018
45 Bihar FP/BR/Others/27213/2017 FP/BR/OTHERS/27213/2017 Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-7, Panchananpur-daudnagar Road in Gaya district of Bihar. Others RAJIVA PRAKASH 0.015 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Jul 2017
Stage-I Approval on : 06 Jul 2018
Compliance Report Submitted by User Agency on : 26 Sep 2018
06 Nov 2018
46 Bihar FP/BR/Others/27216/2017 FP/BR/OTHERS/27216/2017 Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of BPCL on NH-57, Ramvishanpur-Simrahi Bazar Road in Supaul district of Bihar. Others KRISHNANDAN KUMAR 0.0285 APPROVED
Proposal received(at Nodal Officer)electronically on : 18 Jul 2017
Stage-I Approval on : 28 Jun 2018
Compliance Report Submitted by User Agency on : 13 Jul 2018
12 Sep 2018
47 Bihar FP/BR/Others/29790/2017 FP/BR/Others/29790/2017 We proposed for establishment of retail-outlet dealership of Onkaar Auto, Gaya-Wazirganj-Hisua-Nawada Road (NH-82) is 20M The retail-outlet is beside of Katcha Road which was constructed before 1914-15 and constructed by cement road before 1980. There is no other retail-outlet towards Nawada within Others RITA MAITIN 0.004 APPROVED
Proposal received(at Nodal Officer)electronically on : 17 Oct 2017
Stage-I Approval on : 04 Jun 2018
Compliance Report Submitted by User Agency on : 05 Jul 2018
16 Jul 2018
48 Bihar FP/BR/Others/29777/2017 FP/BR/OTHERS/29777/2017 Diversion of 0.00915 ha of forest land for construction of approach road for opening retail outlet of IOCL on on Chhapra-Manjhi-Dalauri-Guthani Road in Siwan district of Bihar. Others PRATIBHA KUMARI SINGH IOCL 0.00915 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Oct 2017
Stage-I Approval on : 07 May 2018
Compliance Report Submitted by User Agency on : 29 Jun 2018
28 Jun 2018
49 Bihar FP/BR/ROAD/28633/2017 FP/BR/ROAD/28633/2017 Consultancy Services for Preparation of Detailed Project Report for road approaches to Rail-cum-Road Bridge across river Ganga at Munger Ghat (Section of NH-333B), near Munger in the State of Bihar Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BEGUSARAI 4.16 Pending at RO for Stage-II
Proposal received(at Nodal Officer)electronically on : 16 Aug 2017
Stage-I Approval on : 23 Apr 2018
Compliance Report Submitted by User Agency on : 15 Dec 2018
50 Bihar FP/BR/ROAD/28636/2017 FP/BR/ROAD/28636/2017 Consultancy service for preparation of Detailed Project Report for Rehabilitation and Upgradation of Maheshkhunt- Saharsa-Purnea Section of NH-107 in the state of Bihar on EPC mode (Package-I & II (Km 00+000 to Km 177+960). Road NATIONAL HIGHWAY AUTHORITY OF INDIA PIU BEGUSARAI 163.826 APPROVED
Proposal received(at Nodal Officer)electronically on : 16 Aug 2017
Stage-I Approval on : 15 Jun 2018
Compliance Report Submitted by User Agency on : 27 Sep 2018
18 Sep 2018
12345678910...
Online Submission & Monitoring
of Forests and Wildlife Clearance Proposals
Please wait ...