Sno. | State Name | Proposal No. | RO/Ministry File Number | Proposal Name | Category | User Agency Name | Area (ha.) | Proposal Status | Important Dates | Allocation of Fresh forest land (Form-A) Part-I | View Report (Part-II to Part-V and Stage-I Clearances) | Stage-II Approval on |
1
|
Andhra Pradesh
|
FP/AP/IND/10371/2015
|
4-APB010/2015-CHN
|
Proposal for Diversion of 0.49Ha forest land in Odalarevu Protected forest
|
Industry
|
ONGC
|
0.49
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Feb 2015
|
Stage-I Approval on
|
:
|
21 Aug 2015
|
Compliance Report Submitted by User Agency on
|
:
|
29 Sep 2016
|
|
|
|
09 Jan 2017
|
2
|
Andhra Pradesh
|
FP/AP/MIN/30265/2017
|
4-APB062/2018-CHN
|
This is new mining lease applied for Barytes by Smt.J.C.Vijaya, Tadipatri. The applied area situated in a backward drought prone district of Ananthapuramu of Andhra Pradesh State. The applied area is in Sy. No. 1/P of Ellutla (V), Putlur (M), Ananthapuramu (D), Andhra Pradesh State over an extent o
|
Mining
|
JC VIJAYA ELLUTLA BARYTES MINE
|
1.95
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2018
|
Stage-I Approval on
|
:
|
21 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
12 Oct 2018
|
|
|
|
02 Nov 2018
|
3
|
Andhra Pradesh
|
FP/AP/Others/14866/2015
|
4-APB008/2015-CHN
|
Diversion of 0.30 Ha of Forest Land in Compt. No. 85 of Pasuvemula RF of WLM -Markapur Division for Laying of Optical Fibre Cable in favour of Idea Cellular Ltd.
|
Others
|
IDEA CELLULAR LIMITED
|
0.3
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Aug 2015
|
Stage-I Approval on
|
:
|
08 Jan 2016
|
Compliance Report Submitted by User Agency on
|
:
|
04 Jul 2016
|
|
|
|
14 Jun 2016
|
4
|
Andhra Pradesh
|
FP/AP/IRRIG/16627/2015
|
4-APB019-2016-CHN
|
Proposal for the Project of Excavation of Tunnel passing through Damarasingi reserve forest hill range.
|
Irrigation
|
WATER RESOURCES DEPARTMENT
|
4.42
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Nov 2015
|
Stage-I Approval on
|
:
|
01 Nov 2016
|
Compliance Report Submitted by User Agency on
|
:
|
19 Jul 2018
|
|
|
|
10 Jul 2018
|
5
|
Andhra Pradesh
|
FP/AP/MIN/10909/2015
|
4-APB047/2017-CHN
|
Quarry lease of Black granite over an extent of 4.83 Ha in Compt.No. 212 of Paradarami RF in favour of M/s Sai Joshitha Granites, Piler
|
Mining
|
SAI JOSHITHA GRANITES
|
4.83
|
Pending at DFO for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
19 Mar 2015
|
Stage-I Approval on
|
:
|
27 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Nov 2018
|
|
|
|
|
6
|
Andhra Pradesh
|
FP/AP/TRANS/22375/2016
|
GO.Rt.No.87, Dt:17.04.2017
|
Proposal for Erection of 33kv Transmission line from wind farm common point VCB yard at pattanagaram to 132/33kv substation of AP Transco grid at Banaganapaali, Kurnool District, A P.
|
Transmission Line
|
APSPDCL DHONE
|
0.85
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Nov 2016
|
Stage-I Approval on
|
:
|
17 Apr 2017
|
Compliance Report Submitted by User Agency on
|
:
|
28 Jun 2017
|
|
|
|
01 Aug 2017
|
7
|
Andhra Pradesh
|
FP/AP/ROAD/10475/2015
|
3343/ Section-II/2016
|
Rehabilitation and upgradation of NH-221 (New NH-30) from Km 32.735 to 71.200 (Chandragudem - AP/Telangana Border Section), Krishna District in the State of Andhra Pradesh, National Highway Development Programme.
|
Road
|
HIGHWAYS
|
0.52
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 Apr 2016
|
Stage-I Approval on
|
:
|
25 Jul 2016
|
Compliance Report Submitted by User Agency on
|
:
|
24 Sep 2016
|
|
|
|
16 Feb 2017
|
8
|
Andhra Pradesh
|
FP/AP/Others/26189/2017
|
4-APB037/2017-CHN
|
Proposal for diversion of Forest land an extent of 0.99 Ha. in the Tadepalli RF, Mangalagiri Block of S.No.372 of Tadepalli Village, for Construction of 132/33KV Sub- Station AIIMS at Mangalagiri in Guntur Division and District for extending Supply to the AIIMS.
|
Others
|
EXECUTIVE ENGINEER CONSTRUCTION DIVISION APTRANSCO GUNTUR
|
0.99
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
17 May 2017
|
Stage-I Approval on
|
:
|
20 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
26 Jun 2018
|
|
|
|
25 Jun 2018
|
9
|
Andhra Pradesh
|
FP/AP/IND/30241/2017
|
4-APB061/2018-CHN
|
ONGC is taking up the development of 98/2 fields of Eastern Offshore (KG Basin) for producing max. 15.57 Million Standard M3 per day of Natural Gas. Gas from deep water drilled wells will be brought ashore through a 24" dia Gas export pipe line. One 8" dia Rich MEG pipeline, one 6" dia Lean MEG pip
|
Industry
|
ONGC
|
0.733
|
IN-PRINCIPLE
|
Proposal received(at Nodal Officer)electronically on
|
:
|
14 Nov 2017
|
Stage-I Approval on
|
:
|
25 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
04 Dec 2018
|
|
|
|
|
10
|
Andhra Pradesh
|
FP/AP/ROAD/19123/2016
|
4-APB017/2016-CHN
|
Diversion of 2.26 Ha of Forest land in Sangam RF of Atmakur Range in Nellore Division for Upgradation of NH-67 from Km.707+500 to Km.708+880 to two lane with paved shoudlers in the State of AP under NHDP-IV through EPC basis.
|
Road
|
MINISTRY OF ROAD TRANSPORT AND HIGHWAYS GOVT OF INDIA
|
2.26
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 May 2016
|
Stage-I Approval on
|
:
|
20 Sep 2016
|
Compliance Report Submitted by User Agency on
|
:
|
17 Jul 2017
|
|
|
|
04 Aug 2017
|
11
|
Andhra Pradesh
|
FP/AP/QRY/26282/2017
|
4-APC051/2017-CHN
|
Proposal for Diversion of 9.16 Ha(Mininig-7.62, Sz-1.40, Road-0.14)of Forestland in Compt.No.200, Bodabandla RF & Beat of Chittoor West Division, Chittoor District in favour of S.S.Granites, Prop: P. Suryanarayana Reddy.
|
Quarrying
|
P SURYANARAYANA REDDY
|
9.16
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
06 Jun 2017
|
Stage-I Approval on
|
:
|
27 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
16 Jul 2018
|
|
|
|
|
12
|
Bihar
|
FP/BR/Others/25453/2017
|
FP/BR/Others/25453/2017
|
Diversion of 0.0045 ha of forest land for construction of approach road for opening retail outlet of BPCL on Vidhapati-Dalsinghsarai Road in Samastipur district of Bihar.
|
Others
|
RAKESH KUMAR PASWAN
|
0.0045
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Mar 2017
|
Stage-I Approval on
|
:
|
11 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
30 Aug 2017
|
|
|
|
06 Dec 2017
|
13
|
Bihar
|
FP/BR/Others/23849/2017
|
FP/BR/OTHERS/23849/2017
|
the applicant on the PWD, Aandar-Raghunathpur Road, District-Siwan on Khata No.- 79, Plot No.- 424, Village – Haibatpur, Takuka - Raghunathpur, State- Bihar. The road side land 0.012 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will suppl
|
Others
|
ASHOK KUMAR GUPTA
|
0.012
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
31 Jan 2017
|
Stage-I Approval on
|
:
|
23 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
10 Oct 2018
|
|
|
|
08 Nov 2018
|
14
|
Bihar
|
FP/BR/Others/18744/2016
|
FP/BR/Others/18744/2016
|
the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc.
|
Others
|
SHILPA
|
0.0244
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Mar 2016
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
08 Dec 2017
|
|
|
|
09 Jan 2018
|
15
|
Bihar
|
FP/BR/ROAD/26896/2017
|
FP/BR/ROAD/26896/2017
|
Widening and Strengthening of Biraul-Singhia via Pipra Road
|
Road
|
EXECUTIVE ENGINEER ROAD DIVISION BENIPUR
|
4.8856
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jun 2017
|
Stage-I Approval on
|
:
|
01 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
01 Jun 2018
|
|
|
|
30 May 2018
|
16
|
Bihar
|
FP/BR/Others/23809/2017
|
FP/BR/Others/23809/2017
|
ESTABLISHMENT OF RETAIL OUTLET OF HINDUSTAN PETROLEUM CORPORATION LIMITED
|
Others
|
HINDUSTAN PETROLEUM CORPORATION LTD
|
0.0387
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
30 Jan 2017
|
Stage-I Approval on
|
:
|
16 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2018
|
|
|
|
14 Nov 2018
|
17
|
Bihar
|
FP/BR/Others/18228/2016
|
FP/BR/Others/18228/2016
|
M/s ultra Tech Cement Ltd. is Proposing for setting up of 2.0 million Tonnes per annum cement Grinding Unit at Villages.
|
Others
|
ULTRATECH CEMENT PVT LTD
|
0.77
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Feb 2016
|
Stage-I Approval on
|
:
|
30 Dec 2016
|
Compliance Report Submitted by User Agency on
|
:
|
21 Aug 2017
|
|
|
|
19 Sep 2017
|
18
|
Bihar
|
FP/BR/Others/31074/2017
|
FP/BR/OTHERS/31074/2017
|
Diversion of 0.0165 ha of forest land for construction of approach road for opening retail outlet of Essar Oil Ltd on the side of Buxar-Kochas-Sasaram Road in Buxar district of Bihar.
|
Others
|
CHANDRA PRAKASH SINGH
|
0.0165
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Dec 2017
|
Stage-I Approval on
|
:
|
23 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2019
|
|
|
|
|
19
|
Bihar
|
FP/BR/ROAD/25893/2017
|
FP/BR/ROAD/25893/2017
|
NH 327 E Galgalia-Thakurganj-Bahadurganj Section Under Kishanganj District
|
Road
|
NH DIVISION ARARIA
|
15.6
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
29 Apr 2017
|
Stage-I Approval on
|
:
|
19 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
13 Oct 2018
|
|
|
|
23 Oct 2018
|
20
|
Bihar
|
FP/BR/Others/25319/2017
|
FP/BR/Others/25319/2017
|
Diversion of 0.00615 ha of forest land for construction of approach road for opening retail outlet of HPCL on Bhagipatty-Samaur Road in Gopalganj district of Bihar.
|
Others
|
PRAMATMA KUMAR SINGH
|
0.00615
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Mar 2017
|
Stage-I Approval on
|
:
|
01 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
16 Oct 2017
|
|
|
|
03 Jan 2018
|
21
|
Bihar
|
FP/BR/TRANS/27209/2017
|
FP/BR/TRANS/27209/2210
|
The scheme is for construction of 400 KV D/C Nabinagar-II Patna Transmission Line. The proposed Transmission Line will connect the 1980 MW capacity Nabinagar stage-II Thermal Power Project (under construction) with 400/220 KV, Patna Substation of POWERGRID, Bihar. The line traverses though Aurangaba
|
Transmission Line
|
POWERGRID CORPORATION OF INDIA LIMITED PATNA
|
1.8446
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2017
|
Stage-I Approval on
|
:
|
18 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2018
|
|
|
|
08 Nov 2018
|
22
|
Bihar
|
FP/BR/Others/27400/2017
|
FP/BR/OTHERS/27400/2017
|
The proposal for establishment of retail outlet dealership of M/s Indian Oil corporation Ltd. Form purbi Nala (khar) within 01 Km From Misir Bandhora Bhore Pagra PWD Road at Mauza- Misir Bandhaura Khata No. 26 Plot No. 747 Vill+P.O. Vijaypur, Dist- Gopalganj. State Bihar. The road Side land 0.01275
|
Others
|
AMRENDRA IOCL
|
0.01275
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Jul 2017
|
Stage-I Approval on
|
:
|
14 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2018
|
|
|
|
08 Aug 2018
|
23
|
Bihar
|
FP/BR/ROAD/17264/2015
|
FP/BR/ROAD/17264/2015
|
The forest land is required for diversion of Forest land for Cunstruction of road from 2nd K.M (Ekmi Ghat) of Darbhanga Samastipur Road (SH-50) to Shobhan Village (NH-57) over the western embankment of Khiroi River from 0 to 9.641 Km in Mithila Forest Division (Darbhanga District) in Bihar State.
|
Road
|
EXECUTIVE ENGINEER ROAD CONSTRUCTION DEPATMENT
|
11.569
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
28 Dec 2015
|
Stage-I Approval on
|
:
|
19 May 2016
|
Compliance Report Submitted by User Agency on
|
:
|
06 Dec 2017
|
|
|
|
04 Oct 2017
|
24
|
Bihar
|
FP/BR/Others/32792/2018
|
FP/BR/OTHERS/32792/2018
|
Diversion of 0.012 ha of forest land for construction of approach road for opening retail outlet of IOCL on the side of Lalganj-Phakuli Road in Vaishali district of Bihar.
|
Others
|
MANOJ KUMAR MISHRA IOCL
|
0.0135
|
Pending at RO for Stage-II
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Mar 2018
|
Stage-I Approval on
|
:
|
21 Dec 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Jan 2019
|
|
|
|
|
25
|
Bihar
|
FP/BR/Others/25243/2017
|
FP/Br/Others/25243/2017
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of Essar Oil Ltd. on Muzaffarpur-Sonbarsa Road (NH-77) in Sitamarhi district of Bihar.
|
Others
|
ANAND RAY
|
0.018
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Mar 2017
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
15 Jan 2018
|
|
|
|
13 Mar 2018
|
26
|
Bihar
|
FP/BR/TRANS/28910/2017
|
FP/BR/TRANS/28910/2017
|
Strengthning of transmisson system in bihar Phase-IV Part-1
|
Transmission Line
|
BSPTCL JAMUI
|
0.14
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
27 Aug 2017
|
Stage-I Approval on
|
:
|
30 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2018
|
|
|
|
05 Oct 2018
|
27
|
Bihar
|
FP/BR/ROAD/22061/2016
|
FP/BR/ROAD/22061/2016
|
Widening and Strengthen in KM Katauna (62.00)- Gidhaur (75.00) KM of NH-333 in the State of Bihar
|
Road
|
EXECUTIVE ENGINEER, NH DIVISION LAKHISARAI AT MUNGER
|
12.4326
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Oct 2016
|
Stage-I Approval on
|
:
|
06 Dec 2017
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2018
|
|
|
|
18 May 2018
|
28
|
Bihar
|
FP/BR/Others/32784/2018
|
FP/BR/OTHERS/32784/2018
|
The proposal for establishment of retail out-let (Petrol Pump) dealership of M/S IOCL Located within 6-10 KM from SH-22 Sultanganj-Deoghar Road District Munger Bihar
|
Others
|
SHAKSHI MOHAN SINGH
|
0.02424
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
26 Mar 2018
|
Stage-I Approval on
|
:
|
30 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
05 Jul 2018
|
|
|
|
07 Aug 2018
|
29
|
Bihar
|
FP/BR/ROAD/26383/2017
|
FP/BR/ROAD/26383/2017
|
Construction of Two Lane with paved Shoulder of Bhagalpur BYPASS From KM 124.175-KM 140.850 Length 16.675 KM of NH-80
|
Road
|
EXECUTIVE ENGINEER NH DIVISION BHAGALPUR
|
0.38
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 May 2017
|
Stage-I Approval on
|
:
|
11 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2018
|
|
|
|
06 Apr 2018
|
30
|
Bihar
|
FP/BR/Others/27395/2017
|
FP/BR/Others/27395/2017
|
Diversion of 0.0.015 ha of forest land for construction of approach road for opening retail outlet of HPCL on on side NH-83, Gaya-Jahanabad Road in Gaya district of Bihar.
|
Others
|
AMRESH KUMAR
|
0.015
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Jul 2017
|
Stage-I Approval on
|
:
|
21 Nov 2017
|
Compliance Report Submitted by User Agency on
|
:
|
12 Mar 2018
|
|
|
|
26 Mar 2018
|
31
|
Bihar
|
FP/BR/WATER/33325/2018
|
FP/BR/WATER/33325/2018
|
Rajgir Nager Panchyat facing acute water shortage every year in order to meet the public requirement the PHED Biharsharife has entrusted to ensure water supply from Falgu River in Nawada district through under ground pipeline the pipeline has to be passed along NH-82 to supply safe drinking water.
|
Drinking Water
|
EXECUTIVE ENGINEER P H DIVISION BIHARSHARIF
|
0.360636
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Apr 2018
|
Stage-I Approval on
|
:
|
16 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
15 Dec 2018
|
|
|
|
04 Jan 2019
|
32
|
Bihar
|
FP/BR/Others/25843/2017
|
FP/BR/Others/25843/2017
|
Diversion of 0.015 ha of forest land for construction of approach road for opening retail outlet of IOCL on SH-7 in Gaya district of Bihar.
|
Others
|
PRADEEP YADAV IOCL
|
0.015
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
25 Apr 2017
|
Stage-I Approval on
|
:
|
11 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
22 Sep 2017
|
|
|
|
24 Nov 2017
|
33
|
Bihar
|
FP/BR/Others/25228/2017
|
FP/BR/Others/25228/2017
|
Diversion of 0.00375 ha of forest land for construction of approach road for opening retail outlet of HPCL on Lalganj Road (SH-74) in Vaishali district of Bihar.
|
Others
|
SATRUDHAN KUMAR
|
0.00375
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Mar 2017
|
Stage-I Approval on
|
:
|
01 Jun 2017
|
Compliance Report Submitted by User Agency on
|
:
|
14 Sep 2017
|
|
|
|
24 Nov 2017
|
34
|
Bihar
|
FP/BR/TRANS/30978/2017
|
FP/BR/TRANS/30978/2017
|
Strengthening of transmission system in Bihar under Phase-IV Part-1
|
Transmission Line
|
BSPTCL SIWAN
|
0.2673
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Dec 2017
|
Stage-I Approval on
|
:
|
30 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
08 Oct 2018
|
|
|
|
05 Oct 2018
|
35
|
Bihar
|
FP/BR/Others/28885/2017
|
FP/BR/Others/28885/2017
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of IOCL on on side Chapra-Marhowrah Raod in Saran district of Bihar.
|
Others
|
BAIJANTI KUMARI
|
0.018
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
24 Aug 2017
|
Stage-I Approval on
|
:
|
03 Apr 2018
|
Compliance Report Submitted by User Agency on
|
:
|
26 Nov 2018
|
|
|
|
14 Nov 2018
|
36
|
Bihar
|
FP/BR/Others/29855/2017
|
FP/BR/ROAD/29855/2017
|
Diversion of 0.03225 ha of forest land for construction of approach road for opening retail outlet of IOCL on Gaya-Dobhi Road (NH-83) in Gaya district of Bihar.
|
Others
|
ALOK AMITHABH
|
0.03225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Oct 2017
|
Stage-I Approval on
|
:
|
18 May 2018
|
Compliance Report Submitted by User Agency on
|
:
|
11 Oct 2018
|
|
|
|
28 Nov 2018
|
37
|
Bihar
|
FP/BR/Others/26352/2017
|
FP/BR/OTHERS/26352/2017
|
Diversion of 0.01275 ha of forest land for construction of approach road for opening retail outlet of ESSAR OIL Ltd. on Siwan-Sarfara (SH-47) Road, in Siwan district of Bihar.
|
Others
|
S M FAZLE HAQUE
|
0.01275
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 May 2017
|
Stage-I Approval on
|
:
|
06 Jul 2018
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2019
|
|
|
|
|
38
|
Bihar
|
FP/BR/Others/25174/2017
|
FP/BR/Others/25174/2017
|
Diversion of 0.00825 ha of forest land for construction of approach road for opening retail outlet of BPCL on Rosra-Samastipur-Dalsinghsarai Road (PWD Road) in Samastipur district of Bihar.
|
Others
|
ABHA SUREKA
|
0.00825
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Mar 2017
|
Stage-I Approval on
|
:
|
11 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
08 Jun 2018
|
|
|
|
28 Jun 2018
|
39
|
Bihar
|
FP/BR/Others/20132/2016
|
FP/BR/Others/20132/2016
|
The road side land 0.0150 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc.
|
Others
|
PRAMOD KUMAR SONI
|
0.015
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
23 Jun 2016
|
Stage-I Approval on
|
:
|
26 Sep 2017
|
Compliance Report Submitted by User Agency on
|
:
|
07 May 2018
|
|
|
|
30 May 2018
|
40
|
Bihar
|
FP/BR/TRANS/22212/2016
|
FP/BR/TRANS/22212/2016
|
Tower Package -P224- TW02 for construction of 400 KV D/C Transmission Line and LILO at Farraka- & Gokerna associated with ERSS-V. The line is passing through district of South 24 Pargana, North 24 Pargana, Nadia, Burdhaman, Murshidabad, Birbhum,in West Bengal, Pakur, Godda, & Sahibganj in Jharkhand,
|
Transmission Line
|
POWERGRID PURNEA
|
0.768
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Nov 2016
|
Stage-I Approval on
|
:
|
06 Jul 2017
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2018
|
|
|
|
14 Nov 2018
|
41
|
Bihar
|
FP/BR/TRANS/26312/2017
|
FP/BR/TRANS/26312/2017
|
Construction of 33 KV Line from Katoria (Banka) to Simurtala 33 KV line from Katoria to Simurtala for evacuation of power from Katoria Substation
|
Transmission Line
|
ELECTRICAL EXECUTIVE ENGINEER (PROJECT), JAMUI
|
9.846
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 May 2017
|
Stage-I Approval on
|
:
|
01 Jun 2018
|
Compliance Report Submitted by User Agency on
|
:
|
25 Oct 2018
|
|
|
|
06 Nov 2018
|
42
|
Bihar
|
FP/BR/ROAD/25145/2017
|
FP/BR/ROAD/25145/2017
|
Widening to 2 lane with paved shoulder from KM 0.00-40.00 of NH-2C Dehri-Banjari-Akbarpur Road
|
Road
|
EXECUTIVE ENGINEER N. H. DIVISION GAYA
|
17.06
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Mar 2017
|
Stage-I Approval on
|
:
|
01 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
22 Mar 2018
|
|
|
|
04 Apr 2018
|
43
|
Bihar
|
FP/BR/Others/18064/2016
|
FP/BR/Others/18064/2016
|
the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pumpsets. etc.
|
Others
|
SUPERNA SAH
|
0.0165
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Feb 2016
|
Stage-I Approval on
|
:
|
20 Jun 2016
|
Compliance Report Submitted by User Agency on
|
:
|
15 Feb 2018
|
|
|
|
09 Apr 2018
|
44
|
Bihar
|
FP/BR/Others/30959/2017
|
FP/BR/OTHERS/30959/2017
|
Diversion of 0.0285 ha of forest land for construction of approach road for opening retail outlet of BPCL on side of NH-57, Simrahi Bazar-Bhaptiyahi Road in Supaul district of Bihar.
|
Others
|
RAMESH PRASAD YADAV
|
0.0285
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2017
|
Stage-I Approval on
|
:
|
08 Aug 2018
|
Compliance Report Submitted by User Agency on
|
:
|
26 Sep 2018
|
|
|
|
08 Nov 2018
|
45
|
Bihar
|
FP/BR/Others/23218/2016
|
FP/BR/Others/23218/2016
|
The road side land 0.0375 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc.
|
Others
|
ABHISHEK KUMAR G
|
0.0375
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
22 Dec 2016
|
Stage-I Approval on
|
:
|
12 May 2017
|
Compliance Report Submitted by User Agency on
|
:
|
31 Jul 2017
|
|
|
|
15 Sep 2017
|
46
|
Bihar
|
FP/BR/Others/20581/2016
|
FP/BR/Others/20581/2016
|
The road side land 0.0416 ha required only for the proposal to use as a approach road so that the vehicle can reach to retail outlet will supply petrol/Diesel to local people. Farmer for vehicle, pump sets. etc.
|
Others
|
RABINDRA KUMAR SHAHI
|
0.0416
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
21 Jul 2016
|
Stage-I Approval on
|
:
|
25 Aug 2017
|
Compliance Report Submitted by User Agency on
|
:
|
13 Sep 2017
|
|
|
|
16 Oct 2017
|
47
|
Bihar
|
FP/BR/Others/32643/2018
|
FP/BR/Others/32643/2018
|
Diversion of 0.018 ha of forest land for construction of approach road for opening retail outlet of HPCL on the side of NH-80 Road in Munger district of Bihar.
|
Others
|
SHAILENDRA KUMAR HPCL
|
0.018
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Mar 2018
|
Stage-I Approval on
|
:
|
28 Nov 2018
|
Compliance Report Submitted by User Agency on
|
:
|
20 Dec 2018
|
|
|
|
17 Jan 2019
|
48
|
Bihar
|
FP/BR/Others/30928/2017
|
FP/BR/OTHERS/30928/2017
|
Diversion of 0.0135 ha of forest land for construction of approach road for opening retail outlet of IOCL on side of Khata no.-151, Khesra No.-341 (P) Mauza - Shobhani, Dist.- Khagariya of Bihar.
|
Others
|
IOCL BEGUSARAI
|
0.0135
|
Pending With-SG for verifying Compliance of Conditions
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Dec 2017
|
Stage-I Approval on
|
:
|
23 Jan 2019
|
Compliance Report Submitted by User Agency on
|
:
|
07 Feb 2019
|
|
|
|
|
49
|
Bihar
|
FP/BR/Others/28797/2017
|
FP/BR/Others/28797/2017
|
The proposal for establishment of retail out-let IOCL dealership of M/s IOCL NH-49 within 2 KM from kushar chowk (Hajipur to Tajpur Road)
|
Others
|
NAVEEN CHANDRA BHARTI
|
0.1225
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
20 Aug 2017
|
Stage-I Approval on
|
:
|
13 Mar 2018
|
Compliance Report Submitted by User Agency on
|
:
|
09 Apr 2018
|
|
|
|
02 May 2018
|
50
|
Bihar
|
FP/BR/Others/26239/2017
|
FP/BR/Others/26239/2017
|
Patna-Motihari-Baitalpur Pipeline and its extension upto Raxaul. This proposal is for Motihari to Raxaul section. Proposed pipeline is going through Motihari Forest Division
|
Others
|
INDIAN OIL CORPORATION LIMITED PIPELINES DIVISION
|
0.6536826
|
APPROVED
|
Proposal received(at Nodal Officer)electronically on
|
:
|
18 May 2017
|
Stage-I Approval on
|
:
|
26 Feb 2018
|
Compliance Report Submitted by User Agency on
|
:
|
18 Jul 2018
|
|
|
|
28 Aug 2018
|
|